Request a Quote Company:*Contact:*Phone:Email:* Address:* Street Address Address Line 2 City State / Province / Region ZIP / Postal Code Information required of:*Field ApplicationShop ApplicationBoth Field and Shop ApplicationBid DateMonthMonth123456789101112DayDay12345678910111213141516171819202122232425262728293031YearYear20262025202420232022202120202019201820172016201520142013201220112010200920082007200620052004200320022001200019991998199719961995199419931992199119901989198819871986198519841983198219811980197919781977197619751974197319721971197019691968196719661965196419631962196119601959195819571956195519541953195219511950194919481947194619451944194319421941194019391938193719361935193419331932193119301929192819271926192519241923192219211920City and state where project is located:*Project involves the following: Liquid Coatings Structural Steel Reinforcing Steel Piping Penstocks Tanks Vessels Ductile Iron Pipe Industry classification: Refinery Chemical plant Food processing plant Power plant (fossil) Power plant (nuclear) Power plant (hydro) Manufacturing plant Ductile iron pipe Lead abatement Other Surface preparation requirements: Sandblast Waterwash (<10,000 psi) Waterjet (>10,000 psi) Sponge blast Soda blast Clean blast Steel shot Remove existing coatings Not sure Coating/Lining requirements: Epoxy Urethane Waterproofing Enamels Coal tar Latex Not sure (need help) Time FrameProject to commence within 1 monthProject to commence within 2-6 monthsProject to commence within 6-12 monthsProject to commence in over 12 monthsApproximate sq. footage involvedLess than 500500 to 2,5002,500 to 7,5007,500 to 15,00015,000 to 30,00030,000 to 60,00060,000 to 125,000Over 125,000Not sureApproximate Budget$1.000 to $5,000$5,000 to $25,000$25,000 to $50,000$50,000 to $100,000$100,000 to $500,000$500,000 to $1,000,000Need HelpComments/QuestionsFileMax. file size: 50 MB.CAPTCHA Δ